(A+B)'s one day's work =130
(B+C)'s one day's work =124..........(1)
(C+A)'s one day's work =120
∴(A+B+C)'s one day's work =12[130+124+120]=12×[20+25+30600]=751200=116...........(2)
(A+B+C)'s 10 day's work =1016=58
Remaining work, 1−58=38 (which is done by A)
From (1) and (2), A's one day's work =116−124=148
∴ Remaining 38 of the work is done by A alone in 38×48=18 days.