0
You visited us 0 times! Enjoying our articles? Unlock Full Access!
Question

Calculate the work done in lifting water of 200 kg through a vertical distance of 6 m. (g=10ms2)
  1. 10 J
  2. 2000 J
  3. 6000 J
  4. 12000 J

A
6000 J
B
2000 J
C
10 J
D
12000 J
Solution
Verified by Toppr

Work done in lifting water = mgh
=200×10×6=12000 J

Was this answer helpful?
43
Similar Questions
Q1
Calculate the work done in lifting water of 200 kg through a vertical distance of 6 m. (g=10ms2)
View Solution
Q2

Calculate the work done in lifting 200kg of water through a vertical height 6meters

View Solution
Q3
An object of mass 2 kg is lifted vertically through a distance of 1.5 m. The work done in process is
View Solution
Q4

A block and tackle system of 5 pulleys is used to raise a load of 50 kgf steadily through a height of 20 m. The work done against friction is 2000J. Calculate the work done by the effort


View Solution
Q5
An object of mass 5 kg falls from rest through a vertical distance of 10 m and acquires a velocity of 10ms1, the work done by the push of air on the object is (g=10ms2)
View Solution